First Floor Update with New Kitchen and bath

April – May 2022


  • New kitchen including a large island with seating, (3) pendant lights, full height upper cabinets, upper and lower cabinet lighting, full tile backsplash, updated hardware and more.

  • Dining room with new flooring, baseboard and window trim, quartz window sills & updated electrical including a new chandelier and dimmer switch.

  • Entryway with new flooring, light fixture, baseboard & stair railing.

  • Living room with an added plug for the tv above the fireplace, updated LED can lights, tile in front of the fireplace, new flooring, baseboards & window trim and a large quartz window sill for extra seating and storage.

  • Full master bath remodel with dual vanity

 

Before & Afters

The Final Space

Previous
Previous

Winthrop

Next
Next

Shagbark